MONEY AND RISK

When something breaks, choose the response.

Random incidents cut production, demand, or both until they end or you deal with them. Each one offers a choice between paying now, paying less to soften it, or absorbing the damage. Preparation made in advance halves the impact.

A Venture Life team working through a difficult day

The four incident types

IncidentOutputDemandLastsEffect
Power outage45%78%1 dayProduction and demand are sharply reduced
Supply disruption68%86%2 daysProduction is restricted by missing supplies
Public complaint100%55%2 daysCustomer demand and investor trust are falling
System failure58%82%2 daysEquipment is degrading and output is reduced

Incident titles vary by business—a power outage in the café is a greenhouse blackout on the farm—but the effects are the same.

Three ways to respond

ResponseCostResult
Emergency responseFull response costEnds the incident now, +2 investor confidence, +3 morale; counts toward Battle tested
Contain the damage38% of the full costThe incident continues, but output and demand partly recover
Keep operatingNothing now−5 customer happiness, −5 investor confidence, −3 morale; the incident keeps running

Response costs grow with the size of the business and with difficulty. Compared with Standard, incidents cost 78% as much on Relaxed and 122% as much on Ambitious. The Battle tested milestone cuts them by 15%.

Preparedness upgrades

Each incident type has a one-time preparation you can buy from the Risk tab. Prepared incidents do half the damage. The base price is 2.4 times the incident’s recovery cost and rises as the company grows.

PreparationProtects againstBase priceEffect
Backup generatorPower outage$3,000Power outages cut output and demand half as much and spoil less stock.
Second supplierSupply disruption$3,720Supply disruptions cut output half as much and hurt morale less.
PR retainerPublic complaint$2,760Public complaints cut demand half as much and do less damage to trust.
Redundant systemsSystem failure$4,560System failures cause half the equipment damage and output loss.

Maintenance contracts

A maintenance contract covers every workstation on every floor. Technicians restore 12% condition each night and fix breakdowns before they stop production. The nightly fee is 7.5% of the base workstation price per workstation, rising as the company grows; cancel it any time.

Choosing a response

  • Resolve incidents that hit what you rely on: an outage during a festival, or a public complaint when demand is already low.
  • Contain an incident when cash is tight but the damage is too large to ignore.
  • Keep operating only through short incidents when cash is needed elsewhere—the trust and morale cost is immediate.
  • Buy preparation for the incidents your business suffers most, before the company grows and preparation becomes more expensive.

PUT YOUR PLAN TO WORK

Your company is waiting.

Start a founder, choose a business, and make the next decision yours.

Play Venture Life