
The four incident types
| Incident | Output | Demand | Lasts | Effect |
|---|---|---|---|---|
| Power outage | 45% | 78% | 1 day | Production and demand are sharply reduced |
| Supply disruption | 68% | 86% | 2 days | Production is restricted by missing supplies |
| Public complaint | 100% | 55% | 2 days | Customer demand and investor trust are falling |
| System failure | 58% | 82% | 2 days | Equipment is degrading and output is reduced |
Incident titles vary by business—a power outage in the café is a greenhouse blackout on the farm—but the effects are the same.
Three ways to respond
| Response | Cost | Result |
|---|---|---|
| Emergency response | Full response cost | Ends the incident now, +2 investor confidence, +3 morale; counts toward Battle tested |
| Contain the damage | 38% of the full cost | The incident continues, but output and demand partly recover |
| Keep operating | Nothing now | −5 customer happiness, −5 investor confidence, −3 morale; the incident keeps running |
Response costs grow with the size of the business and with difficulty. Compared with Standard, incidents cost 78% as much on Relaxed and 122% as much on Ambitious. The Battle tested milestone cuts them by 15%.
Preparedness upgrades
Each incident type has a one-time preparation you can buy from the Risk tab. Prepared incidents do half the damage. The base price is 2.4 times the incident’s recovery cost and rises as the company grows.
| Preparation | Protects against | Base price | Effect |
|---|---|---|---|
| Backup generator | Power outage | $3,000 | Power outages cut output and demand half as much and spoil less stock. |
| Second supplier | Supply disruption | $3,720 | Supply disruptions cut output half as much and hurt morale less. |
| PR retainer | Public complaint | $2,760 | Public complaints cut demand half as much and do less damage to trust. |
| Redundant systems | System failure | $4,560 | System failures cause half the equipment damage and output loss. |
Maintenance contracts
A maintenance contract covers every workstation on every floor. Technicians restore 12% condition each night and fix breakdowns before they stop production. The nightly fee is 7.5% of the base workstation price per workstation, rising as the company grows; cancel it any time.
Choosing a response
- Resolve incidents that hit what you rely on: an outage during a festival, or a public complaint when demand is already low.
- Contain an incident when cash is tight but the damage is too large to ignore.
- Keep operating only through short incidents when cash is needed elsewhere—the trust and morale cost is immediate.
- Buy preparation for the incidents your business suffers most, before the company grows and preparation becomes more expensive.